The Problem: The Consequence: |
The Problem: The Consequence: |
The Problem: The Consequence: Previous Fixes: |
The Problem: A refinery had continuous nuisance leakage from a bank of high temperature heat exchangers with 3/4” bolts. Assessment of the joint integrity revealed that an extremely high assembly bolt load (90% of yield) was required in order to ensure good joint integrity. The Consequence: Leakage of these joints was problematic for the re nery, requiring shutdown to retighten the joints and, on occasion, shutdown to replace the gaskets. The cost associated with these activities, and the risk to personnel were substantial. Previous Fixes: Other load indicating bolts had been used in the past, but due to the small diameter of the bolts and the larger bore of the device, these devices prevented... |
RT-Bolt can be read with analogue or digital probes
Both analogue and digital probes are available and can be produced with a ceramic base for high or low temperature measurement, there is also the option to have a removable probe or a permanently installed probe.